
Covering new concrete with plastic sheeting, or visquene, is a common practice in the construction industry. It is done to protect the concrete from adverse weather conditions such as rain, snow, or freezing temperatures, which can negatively impact the curing process. Plastic sheeting acts as a protective barrier, helping to prevent moisture loss, temperature fluctuations, and debris accumulation, ensuring the concrete cures uniformly and minimizing the risk of cracking or scaling. However, applying plastic too early, before the concrete is fully cured, can cause discoloration and mottling due to uneven drying. Therefore, the timing of applying plastic sheeting is critical to ensure the successful curing and aesthetic quality of the concrete.
| Characteristics | Values |
|---|---|
| Purpose | To protect newly poured concrete from environmental factors that can compromise its integrity during the curing process. |
| Benefits | Shields concrete from moisture loss, temperature fluctuations, and debris accumulation, ensuring durability. |
| Use Cases | Recommended for exposed outdoor areas, large surface areas, and decorative colored floors to ensure uniform curing and prevent cracking or scaling. |
| Timing | Should be laid down immediately after pouring the concrete to maintain a moist surface and uninterrupted curing. |
| Technique | The surface should be clean and free from debris, excess water, or loose material before applying the plastic sheeting. |
| Coverage | The sheeting should cover the entire area without gaps or exposed sections to ensure effective protection. |
| Duration | Plastic covering can be left on for several days, depending on weather conditions and the concrete's curing progress. |
| Discoloration | Plastic sheeting may cause discoloration or pattern stains if left on the concrete for too long or if wrinkles form. |
| Alternatives | Other methods include misting with water, using burlap, or applying a chemical curing compound to eliminate the need for a "wet" cure. |
Explore related products
What You'll Learn

Plastic sheeting protects concrete from harsh weather conditions
Plastic sheeting is often used to protect new concrete from harsh weather conditions. It acts as a barrier, shielding the concrete from environmental factors that can affect its curing process and final appearance. This protective layer helps prevent moisture loss, temperature changes, and debris accumulation, ensuring the concrete cures uniformly and is durable.
In cold and wet weather, plastic sheeting can be used to protect new concrete from freezing temperatures and precipitation. It helps retain heat generated during cement hydration and prevents the concrete surface from drying out too quickly. This is crucial to prevent surface cracks that can form due to rapid moisture loss.
In hot and dry weather, plastic sheeting can be used to prevent the concrete from drying out too quickly and to protect it from rain. Plastic sheeting helps to retain moisture in the concrete, ensuring it cures properly. However, it is important to note that plastic sheeting can also cause discoloration if it is not applied correctly. Wrinkles or direct contact with the concrete can cause light-coloured stripes or mottled finishes.
To effectively use plastic sheeting, it should be laid down immediately after pouring the concrete, ensuring the surface is clean and free from debris. The sheeting should cover the entire area without gaps, as exposed sections can lead to uneven curing. Timing is critical, and proper application techniques must be followed to ensure successful curing and the desired final appearance.
Plastic sheeting is a wise investment to protect new concrete from harsh weather conditions. It helps ensure the concrete cures uniformly, maintains its structural integrity, and has a durable and aesthetically pleasing finish. However, it is important to be cautious and follow the correct application techniques to avoid any adverse effects on the concrete's appearance or integrity.
Integrating Plastic SCM with Unity: A Beginner's Guide
You may want to see also
Explore related products

It helps to retain moisture and cure harder
Concrete is covered with plastic to retain moisture and cure harder. Plastic sheeting serves as a protective barrier that shields newly poured concrete from various environmental factors that can compromise their integrity during the initial curing process. This protective layer helps prevent moisture loss, temperature fluctuations, and debris accumulation, ensuring a strong and durable final result.
Plastic sheeting is particularly crucial for exposed outdoor locations, where harsh weather conditions such as sun, wind, or rain can negatively impact the curing process. Large surface areas also benefit from plastic sheeting to ensure uniform curing and minimize the risk of cracking or scaling.
The timing of applying plastic sheeting is essential. It should be laid down immediately after the concrete is poured to ensure that the surface remains moist and the curing process is uninterrupted. However, applying plastic too early, when there is still excess water or "late bleed water" on the surface, can cause issues. When the plastic makes localized contact with a "still wet" surface, the moisture can coagulate, resulting in a mottled finish with visible shading variations.
To avoid these issues, the concrete surface should be prepared before applying the plastic sheeting. It should be clean and free from debris, excess water, or any loose material. The sheeting should then be unrolled to cover the entire area without any gaps or exposed sections.
Additionally, it is important to note that while plastic sheeting helps retain moisture, it should not be the only curing method. Intermittent wetting or misting the concrete with water during the first few days is also recommended to ensure proper curing and hardening of the concrete.
The Plastic Island's Impact: An Environmental Catastrophe
You may want to see also
Explore related products

Concrete covered too early can result in a mottled finish
Concrete is a complex mixture, and the type of cement, mineral admixtures, and sand used can all affect the final colour. Any variation in these components will cause a difference in colour from one part of a floor to another. Changes in the water-cement ratio can also cause colour differences. A lower water-cement ratio will lead to a darker colour, while a higher ratio will result in a lighter colour.
One of the factors that can influence the water-cement ratio is the use of plastic sheeting to cover the concrete during the curing process. Plastic sheeting is often used to protect new concrete from adverse weather conditions, such as rain, snow, or freezing temperatures, which can negatively impact the curing process. It helps prevent moisture loss and temperature fluctuations, ensuring the concrete cures uniformly and minimises the risk of cracking or scaling.
However, if plastic sheeting is applied too early, it can cause a mottled finish on the concrete. This happens when the concrete surface is still wet, and the plastic makes localized contact. The moisture coagulates with the plastic, but if there are areas where the plastic is not in full contact, air pockets will form. This causes the surface to dry at different rates, resulting in two distinct, visible shading variations. This effect can also be caused by using metal blades on trowels, which abrade the metal onto the surface and darken it.
To avoid a mottled finish, it is essential to ensure that the plastic sheeting is in full contact with the concrete surface and remains so for the entire curing process. If there are gaps or exposed sections, the concrete will cure unevenly, leading to the mottled appearance. Unfortunately, there are limited after-market solutions to fix a mottled finish. While pigmented stains can be used to disguise the discolouration, they may require a significant alteration of the concrete colour, which may not be aesthetically desirable.
Plastic's Deadly Impact: Destroying Our Planet
You may want to see also
Explore related products

Plastic sheeting prevents temperature fluctuations and debris accumulation
Plastic sheeting is a protective measure for new concrete. It is particularly useful in outdoor areas, where it can shield concrete from harsh weather conditions such as sun, wind, and rain. It is also useful for large surface areas, as it ensures uniform curing and reduces the risk of cracking or scaling.
Plastic sheeting helps to prevent temperature fluctuations, which can be crucial in cold and wet conditions. It keeps the heat generated during cement hydration and prevents the concrete surface from drying out. This is important because concrete that dries out before it cures can become dead concrete. However, applying plastic too early can cause problems. If finishing and late bleed water are still present on the surface, the moisture will coagulate with the contact surfaces of the plastic. If the plastic is not in full contact with the surface, air pockets will form, and the surface will dry at different rates, resulting in a mottled finish.
To avoid this issue, it is essential to prepare the surface before applying plastic sheeting. The surface should be clean and free from debris, excess water, or any loose material. The plastic sheeting should be laid down immediately after the concrete is poured to ensure that the surface remains moist and the curing process is uninterrupted. It should cover the entire area without any gaps or exposed sections.
In addition to preventing temperature fluctuations, plastic sheeting also helps to prevent debris accumulation. This is especially important for decorative coloured floors, which require protection to maintain their colour integrity and pattern during the curing phase. Plastic sheeting acts as a protective barrier, shielding the concrete from various environmental factors that could compromise its integrity during the initial curing process.
Plastic and Latex: What's the Connection?
You may want to see also
Explore related products

It ensures uniform curing and minimises the risk of cracking
Concrete is a mixture of cement and other aggregates that harden over time. When concrete is poured, it needs to be protected from the elements to ensure it sets and cures properly. This is where plastic sheeting comes in.
Plastic sheeting serves as a protective barrier that shields newly poured concrete from various environmental factors that can compromise its integrity during the initial curing process. This protective layer helps prevent moisture loss, temperature fluctuations, and debris accumulation, ensuring a strong and durable final result.
One of the main benefits of using plastic sheeting is that it ensures uniform curing. Concrete needs to be cured slowly and evenly to achieve optimal strength and durability. By covering the concrete with plastic, you create a consistent environment that allows the concrete to cure at the same rate across the entire surface. This uniform curing process helps to minimise the risk of cracking.
When concrete dries too quickly or unevenly, it can lead to surface cracks. These cracks not only affect the aesthetics of the concrete but also compromise its structural integrity. Plastic sheeting helps to prevent this by regulating moisture loss and temperature changes, which are two critical factors in the curing process.
It's important to note that while plastic sheeting can be highly effective, proper timing and application techniques are crucial. The plastic sheeting should be laid down immediately after the concrete is poured, ensuring that the surface is clean and free from debris, excess water, or any loose material. The sheeting should cover the entire area without any gaps or exposed sections. If applied too early, when the concrete surface is still wet, plastic sheeting can cause mottling or discolouration due to uneven drying.
In conclusion, using plastic sheeting to cover new concrete is a wise investment in the long-term durability and aesthetics of the surface. By ensuring uniform curing and minimising the risk of cracking, plastic sheeting helps to protect your concrete project and ensure its longevity. However, it is important to follow proper application techniques and timing to avoid potential issues.
Black+Decker Plastic: BPA-Free?
You may want to see also
Frequently asked questions
Covering new concrete with plastic sheeting helps to protect it from harsh weather conditions and environmental factors, such as rain, snow, wind, and temperature fluctuations, which can negatively impact the curing process.
The plastic sheeting acts as a protective barrier, preventing moisture loss, temperature fluctuations, and debris accumulation. This helps to ensure the concrete cures uniformly, reducing the risk of cracking or scaling.
The plastic sheeting should be laid down immediately after the concrete is poured to ensure the surface remains moist and the curing process is uninterrupted.
Yes, if the plastic is applied too early when the concrete surface is still wet, it can cause discoloration and mottling due to uneven drying. Wrinkles in the plastic sheeting can also cause discoloration.
The plastic covering should be removed after a few days. It is recommended to keep the concrete covered and moist for 3 to 6 days to ensure proper curing.




































